Zongoiri Gold Project — Maripoma Mining Services
Project Brief · Upper East Region, Ghana

Zongoiri Gold Project

A world-class gold development in the heart of the Birimian Greenstone Belt

600 koz
Economically Mineable Gold
157.5 km²
Total Concession Area
10.684 km²
Phase 1 Development Area
NI 43-101
Compliant Resource Estimate
Project Overview

An Early-Stage Gold Development in Northern Ghana

The Zongoiri Gold Project (ZGP) is a pre-construction stage gold development located in Ghana's Upper East Region. The project is situated within the Paleoproterozoic Nangodi Greenstone Belt — part of the Birimian geological province that hosts several producing gold mines across Ghana and neighbouring Burkina Faso.

The project covers a total concession area of approximately 157.5 km², covered by a granted Mining Lease. The project is currently being advanced toward construction based on a Pre-Feasibility Study (PFS) undertaken by a Ghanaian Qualified Person (QP) consultancy.

The PFS outlines a processing plant designed to treat free-milling Birimian gold mineralisation typical of the Nangodi belt, using gravity recovery followed by cyanide leaching.

Project Location Details

CountryGhana, West Africa
RegionUpper East Region
Geological BeltPaleoproterozoic Nangodi Greenstone Belt
ProvinceBirimian Geological Province
Concession Area157.5 km²
Mining LeaseGranted
Environmental PermitIn Progress
Project StagePre-Construction (PFS Complete)
Geology

Geological Setting

Regional Geology

Metavolcanics and metasediments
Porphyritic granodiorite intrusions
Regional shear structures related to Birimian tectonics

Gold Mineralisation

Occurs primarily in sheared granodiorite and altered volcanic rocks
Consistent with gold styles observed elsewhere in the Birimian belt
Mineralized zones form multiple steeply dipping lenses that remain open along strike and at depth
Resource Estimate

Mineral Resource — NI 43-101 Compliant

MeasuredHighest confidence resource category
IndicatedModerate confidence — drill-defined
InferredLower confidence — open for upgrade

Resource Highlights

Total Economically Mineable600 koz
StandardNI 43-101 Compliant
Processing MethodFree-milling (gravity + CIL)
Mineralisation StyleBirimian shear-hosted gold
Open Along StrikeYes — significant upside
Open at DepthYes — multiple lenses
Metallurgy

Metallurgical Testwork Results

Testing confirms the Zongoiri ore is free-milling and amenable to gravity recovery followed by cyanide leaching.

01
Crushing
Primary & secondary crushing to reduce ore size
🔄
02
Grinding
Ball mill grinding to liberation size
03
Gravity Recovery
Centrifugal concentrators capture coarse gold
🧪
04
CIL Leaching
Carbon-in-leach cyanidation of remaining gold
🥇
05
Gold Doré
Smelting to produce gold doré bars for export
High
Gravity Recovery
Coarse free gold captured by centrifugal concentrators
High
CIL Recovery
Remaining gold recovered by carbon-in-leach cyanidation
>90%
Overall Recovery
Combined gravity + CIL recovery rate confirmed by testwork
Development Timeline

Path to Production

Complete
Mining Lease Issued
Complete
Pre-Feasibility Study (PFS)
In Progress
Environmental Permitting
Planned
Resource Upgrade Drilling
Planned
Process Plant Manufacturing (Yantai Xinhai)
Planned
Installation & Commissioning
Target
First Gold Pour
EPC Partner

Process Plant: Yantai Xinhai Mining Design

The process plant will be delivered under a turnkey EPC contract with Yantai Xinhai Mining Design, covering engineering design, equipment manufacturing, installation, and commissioning.

Engineering design
Equipment manufacturing
Installation & commissioning
Operator training

Phase 1 Infrastructure

🏭Process plant (gravity + CIL circuit)
Diesel power generation infrastructure
🏕Site camp and accommodation
💧Water supply and management systems
🛣Access roads and site infrastructure
🔬Assay laboratory